BR DEPARTMENTAL DEPOTS & STABLING POINTS
wp2060f160_0f.jpg
Centred on TQ01104719, North of the line, east of Shalford Station
wp64c4ea83.png
wp1e157742.png
wp82aba6e1.png
wp58482ef6.png
A nine-road marshalling yard opened here in October 1941 to handle war-time traffic but after 1945 saw little use, handling mail vans, until 1958 when it was utilized as a temporary stabling point to accommodate locomotives whilst the turntable at Guildford MPD was under repair. During 1965/7 it was employed as a PW Depot in connection with the Bournemouth Electrification Scheme. The yard closed on May 8th, 1967 and the lines lifted.
Facilities;
The loco stabled in the yard
Locomotive Allocation & Duties;
DS209 Shunting in the yard and on-site during track work [November 1966-February 1967] (Also utilized at Woking Engineer’s Yard [Up Side])
wp39acff58.png
wp77eadaf9.png
SHALFORD ENGINEER’S YARD